Climbing formwork K
The versatile climbing formwork assembled from a folding platform and a formwork element
Extremely easy to set up, can be cycled in one piece
The formwork element, climbing scaffold, and platform are firmly connected to one another and are cycled in one piece in a single crane-lift. This reduces lifting times, so it also cuts down on crane time.

Rapid working
thanks to easy handlingReduced labour and crane times, as
climbing platform and formwork are cycled together in one piece
formwork can be plumbed and aligned very quickly
tiltable formwork element makes it easy to set up and strike the formwork
pre-assembled, work-ready platform units
Lower manpower costs
thanks to fast working routinesThis practical system
saves time by combining several operations into one
lowers labour costs as the formwork can be set up and struck with no need for a crane
avoids time-consuming interim storage

The Folding platform K can be combined with any Doka wall formwork system to make the versatile Climbing formwork K, using only two accessories (a suspended platform and connection shoes).

Further contacts 


