Guided climbing formwork Xclimb 60

The struc­ture-at­tached crane-lift­ed climb­ing sys­tem

The safe way up to the next cast­ing sec­tion, in just one lift

The Guid­ed climb­ing form­work Xclim­b 60 is a sys­tem in which the en­tire unit is struc­ture-guid­ed at all times, even while be­ing re­po­si­tioned. Even in windy con­di­tions, an en­tire screen unit is re­po­si­tioned safe­ly and eas­i­ly in one sin­gle lift.

The ul­ti­mate in flex­i­bil­i­ty

thanks to the in­no­va­tive, mo­d­u­lar sys­tem

Ben­e­fit from the sys­tem's mul­ti-use ca­pa­bil­i­ty

  • for walls, for fa­cades or as a pro­tec­tion screen

  • vari­able plat­forms that al­low per­fect adap­ta­tion to the ge­ome­try of the struc­ture

  • fin­ish­ing-work plat­forms can be at­tached any­where on the pro­file

High stan­dard of safe­ty

for your site crew

Safe­ty is "built in" to all phas­es of the work, as

  • the guid­ed re­po­si­tion­ing op­er­a­tion is in­de­pen­dent of the weather

  • en­clo­sures can eas­i­ly be con­struct­ed with ma­te­rials that are adapt­ed to the re­quire­ments

  • the plat­forms are sized to the ide­al width for prac­ti­cal work­ing

  • the Lad­der sys­tem XS can eas­i­ly be in­te­grat­ed

Sim­ple mo­d­u­lar de­sign con­cept

based on a prac­ti­cal "con­struc­tion-kit" sys­tem

Save time and mon­ey be­cause of

  • the high de­gree of pre-as­sem­b­ly

  • the way the sys­tem sim­pli­fies plan­n­ing, util­i­sa­tion and han­dling

  • the fa­cil­i­ty for leav­ing ser­vice loads in place on the plat­forms even while th­ese are be­ing re­po­si­tioned

Media

Doka Climbing Systems "High Expectations" Play Doka Climbing Systems "High Expectations"
Climbing sequence Play Climbing sequence
More

Guid­ed climb­ing form­work Xclimb 60

One crane-lift cycle is all it takes to raise the formwork unit, swiftly and independently of the wind conditions, as it is guided up the side of the structure.

A stur­dy, safe con­nec­tion

The formwork unit is permanently attached to the structure by the vertical profile and the guiding shoe, in every phase of every cycle. During the lifting operation the vertical profile is safely guided in a minimum of 2 guiding shoes.

Out­s­tand­ing work­place safe­ty

Integrable ladderways and manholes provide safe access routes between the working platforms. When designing climbing formwork solutions, the Doka planning professionals integrate all safety accessories, tailoring them to the construction project in hand.

Easy to get right first time

The Xclimb 60 system is so user-friendly that after a brief familiarisation phase supervised by a Doka formwork instructor, the site crew quickly "get it" and can then work entirely unaided.

Pro­tec­tion screen Xclimb 60

The full-area enclosure around the uppermost levels of the building enables all work to be carried out in complete safety, protected from all climatic influences. An integrable loading platform, or the Table Lifting System TLS, makes easy and safe work of repositioning floor-slab formwork, tools and other materials.

Media

Doka Climbing Systems "High Expectations" Play Doka Climbing Systems "High Expectations"
Climbing sequence Play Climbing sequence
More