calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkclose
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK
Contact
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK
Back

Dokaset

The wall formwork that needs up to 50 percent fewer ties

Dokaset is a fast, cost-saving wall formwork system for the building construction segment. All operations such as attaching the lifting chain and placing the form-ties can be carried out very quickly and easily from ground level. Fully pre-mounted working platforms, the Xlife formwork sheet and wide tie spacing are among the practical features that set this all-in-one system apart.

Downloads

The fast formwork system for walls
will speed up work at your site 

  • up to 50 percent fewer wall-ties than conventional framed formwork systems
  • shorter forming-times, as the formwork can be tied working from one side only
  • ready for use in a few simple steps

High safety during forming and pouring
ensures fast working and safe worksite conditions 

  • the crew can place the form-ties and attach the lifting chain working from ground level
  • ladders, working platforms and railings are all integrated in the system

Highly economical
as it is easy to operate and extremely durable 

  • small number of form-ties, which are quick and easy to operate
  • steel frames hot-dip galvanised both inside and out
  • long-life, easy-to-clean Xlife sheet
  • widely spaced form-ties, for short forming-times

Versatile range of possible uses
for fast adaptation to any on-site situation 

  • can easily be combined with Framax Xlife and Alu-Framax Xlife
  • can be vertically stacked very quickly, using panels from the Framax Xlife 'construction kit'

System

Dokaset

  • rugged large-area panels for a low form-tie ratio
  • integral platforms and ladders, providing a high level of workplace safety
  • sturdy steel frames, galvanised both inside and out, for flat, plane concrete faces
  • stacking elements from the Framax Xlife 'construction kit' permit formwork heights of up to 412 cm

Framax Xlife sheet

  • very high numbers of re-use cycles possible, thanks to plastic-enhanced surface and special sheet structure
  • fewer positive imprints, due to the sheet's great resistance to scratching and vibrator damage
  • fewer areas needing repair, as there is no splintering and far less swelling around nail-holes
  • easy, fast (intermediate) cleaning, also using high-pressure washer

Not many form-ties, and quick to operate

Pressure ties at the top edge automatically keep the formwork-halves the right distance apart. These form-ties do not need to be operated. The tension ties can be operated from one side of the formwork, which is ergonomically convenient and saves a lot of time.

High safety during forming and pouring

The access route to the working platform is safeguarded thoroughly and well. An integrable ladder enables the crew to climb up and down quickly and safely. With its rear and side guard rails, the working platform provides all-round protection during pouring.

Wide form-tie spacing

Wide spacing between the form-ties means fewer form-tie points. This saves on equipment, labour and costs, making for a high degree of cost-efficiency.

Safe lifting and resetting

The lifting chain can be reached from ground level – for great workplace safety.