calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

S10 dual carriageway, Structure F25

Austria

The S10 is a dual carriageway trunk road under construction in Upper Austria, that forms part of European route 55. For forming the 2-cell cross-section of Structure F25 (the 'Ganglsiedlung' cut-and-cover tunnel), Doka supplied its newly developed Tunnel system DokaCC. The V-shaped strut configuration of this new system makes for easy shoring despite the use of strip footings.

Back

Project data

Year of completion
2013
Project duration
4 Months
Country
Austria
Address
Neumarkt
Town or city
Neumarkt
Realization
PORR AG
Structure
Tunnel
Type of structure
Cut-and-cover tunnel

Wall

Construction method
Partially monolithic
Cross-sectional shape
Rectangular
Clear width
9.8 m
Clear height
5.7 m
Formed length of tunnel
225 m
Length of concreting section
12.5 m
Number of casting sections
18