calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Xiangjiaba Ship Lift Project

China

China Gezhouba Group Corporation is the prime contractor responsible for the construction of Xiangjiaba Hydropower Station, which is located in the lower reaches of the Jinsha River. With a crest height of 384 m, the dam controls a basin spanning 458,800 square kilometres, accounting for 97% of the total area of the Jinsha River Basin. At present, the project is still in the construction phase. Primarily used the hydraulic Automatic climbing system SKE50 and the Large-area formwork Top 50.

Back

Project data

Year of completion
2013
Project duration
15 Months
Country
China
Address
Xiangjiaba Dam in Yibin, Sichuan Province
Town or city
Sichuan Province
Realization
China Gezhouba Group Corporation – Three Gorges Branch
Structure
Civil engineering

Wall

Construction method
Single-sided
Structure height
138 m
Height of casting sections
3.5 m
Cycle time
Four-day cycle -day cycle