The system is usually anchored to the structure by the Tie rod system 15.0.


 

Risk of confusion!

➤ When the system is combined with Doka automatic climbing systems, the Tie rod system 20.0 must be used throughout the entire project to avoid confusion.

This also applies to combinations with guided climbing systems (e.g. Guided climbing formwork Xclimb 60).

01190132.jpg

A   Universal climbing cone 15.0 or
Universal climbing cone 15.0 2G

B   Sealing sleeve K 15.0 (expendable anchoring component)

C   Stop anchor (expendable anchoring component)

D   Cone screw B 7cm

▪ Universal climbing cone 15.0 or
Universal climbing cone 15.0 2G

- The positioning points and the suspension points are both prepared using the same cone.

▪ Stop anchor

- Expendable anchoring component for anchoring the universal climbing cone (and thus the climbing unit) in the concrete from one side.

▪ Cone screw B 7cm

- Positioning point – for fastening the universal climbing cone.

- Suspension point – safe means of suspending the climbing unit.

.