Using with Dokaflex
|
NOTICE ▪ It is permitted to combine the Floor prop extension 0.50m mit Doka floor props Eurex 30 top, Eurex 20 top and Eco 20. ▪ Allow for the reduced load-bearing capacity when planning and when carrying out the assignment. ▪ The floor props can only be used with their outer tubes at the bottom. |
.