Using with temporary repropping
|
NOTICE ▪ It is permitted to combine the Floor prop extension 0.50m mit Doka floor props Eurex 30 top, Eurex 20 top and Eco 20. ▪ Allow for the reduced load-bearing capacity when planning and when carrying out the assignment. ▪ The floor props may be used with their outer tubes either at the top or at the bottom. |
.