Framax Xlife universal panel 1.20m
Example: Column, 90 x 90 cm
a ... 10 cm to 105 cm (in 5 cm increments)
E Framax frontal triangular ledge |
Schedule of materials needed with Universal panels 1.20m
Formwork height (H) |
Universal panels (A) |
Quick-acting clamps RU (B) |
Universal fixing bolts (C) |
Super-plates 15.0 (D) |
Formwork-half with platform |
Formwork-half without platform |
|||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
|
||||||||||||
3.30m |
2.70m |
1.35m |
0.90m |
Panel struts |
Panel struts |
||||||||
340 |
540 |
Eurex |
340 |
540 |
Eurex |
||||||||
0.90m |
|
|
|
4 |
|
8 |
8 |
➀ |
|
|
➀ |
|
|
1.35m |
|
|
4 |
|
|
8 |
8 |
➀ |
|
|
➀ |
|
|
1.80m |
|
|
|
8 |
8 |
16 |
16 |
➀ |
|
|
➀ |
|
|
2.25m |
|
|
4 |
4 |
8 |
16 |
16 |
3 |
|
|
2 |
|
|
2.70m |
|
4 |
|
|
|
16 |
16 |
3 |
|
|
2 |
|
|
3.15m |
|
|
4 |
8 |
16 |
24 |
24 |
3 |
|
|
2 |
|
|
3.30m |
4 |
|
|
|
|
20 |
20 |
3 |
|
|
2 |
|
|
3.60m |
|
4 |
|
4 |
8 |
24 |
24 |
3 |
|
|
2 |
|
|
4.05m |
|
4 |
4 |
|
8 |
24 |
24 |
3 |
|
|
2 |
|
|
4.20m |
4 |
|
|
4 |
8 |
28 |
28 |
3 |
|
|
2 |
|
|
4.50m |
|
4 |
|
8 |
16 |
32 |
32 |
|
3 |
|
|
2 |
|
4.65m |
4 |
|
4 |
|
8 |
28 |
28 |
|
3 |
|
|
2 |
|
4.95m |
|
4 |
4 |
4 |
16 |
32 |
32 |
|
3 |
|
|
2 |
|
5.10m |
4 |
|
|
8 |
16 |
36 |
36 |
|
3 |
|
|
2 |
|
5.40m |
|
8 |
|
|
8 |
32 |
32 |
|
3 |
|
|
2 |
|
5.55m ➂ |
4 |
|
4 |
4 |
16 |
36 |
36 |
|
3 |
|
|
2 |
|
5.85m ➂ |
|
4 |
4 |
8 |
24 |
40 |
40 |
|
3 |
|
|
2 |
|
6.00m ➂ |
4 |
4 |
|
|
8 |
36 |
36 |
|
3 |
|
|
2 |
|
6.30m ➂ |
|
8 |
|
4 |
16 |
40 |
40 |
|
3 |
|
|
2 |
|
6.45m ➂ |
4 |
|
4 |
8 |
24 |
44 |
44 |
|
3 |
|
|
2 |
|
6.60m ➂ |
8 |
|
|
|
8 |
40 |
40 |
|
3 |
2 |
|
2 |
2 ➁ |
6.75m ➂ |
|
8 |
4 |
|
16 |
40 |
40 |
|
3 |
2 |
|
2 |
2 ➁ |
6.90m ➂ |
4 |
4 |
|
4 |
16 |
44 |
44 |
|
3 |
2 |
|
2 |
2 ➁ |
7.20m ➂ |
|
8 |
|
8 |
24 |
48 |
48 |
|
3 |
2 |
|
2 |
2 ➁ |
7.35m ➂ |
4 |
4 |
4 |
|
16 |
44 |
44 |
|
3 |
2 |
|
2 |
2 ➁ |
7.50m ➂ |
8 |
|
|
4 |
16 |
48 |
48 |
|
3 |
2 |
|
2 |
2 ➁ |
7.65m ➂ |
|
8 |
4 |
4 |
24 |
48 |
48 |
|
3 |
2 |
|
2 |
2 ➁ |
7.80m ➂ |
4 |
4 |
|
8 |
24 |
52 |
52 |
|
3 |
2 |
|
2 |
2 ➁ |
7.95m ➂ |
8 |
|
4 |
|
16 |
48 |
48 |
|
3 |
2 |
|
2 |
2 ➁ |
8.10m ➂ |
|
12 |
|
|
16 |
48 |
48 |
|
3 |
2 |
|
2 |
2 ➁ |
All figures in items.
➀ Site-provided panel bracing.
➁ Eurex 60 550 only needed on free-standing formwork-halves.
➂ Formwork-halves with a column formwork platform must be separated before being lifted (max. formwork height when lifting a formwork-half assembled from Universal panels 1.20m and including an attached Column formwork platform 150/90cm: 5.40 m).
.