Striking and repositioning the panels
Before lifting: Remove any loose items from the formwork and platforms, or secure them firmly.
|
WARNING The formwork tends to adhere to the concrete. When stripping the formwork, do not try to break concrete cohesion using the crane! Risk of crane overload. ➤ Use suitable tools such as timber wedges or a special pry-bar to detach the formwork from the concrete. |
➤ Lift the gang-form to its new location (guide with tag-lines if necessary).
.