Checklist for inspection

 

The supervisor must perform a complete sight-check of the following elements to ensure that they are correctly installed and that no damage or defects have occurred.

 

CONTRACTOR:

SUPERVISOR:

CONSTRUCTION PROJECT:

INSTALLATION PERIOD:

SERIAL NUMBER OF THE LOADING PLATFORM:

USAGE LOCATION:

POS

ELEMENT TO BE CHECKED

CHECKED

1

Main beam

No visible damage

 

2

Platform decking

No visible damage + bolted to main beams

 

3

Crane lifting points

No visible damage to steel lifting eyes and weld seams

 

4

Railings

No visible damage + all threaded fasteners/pins installed

 

5

Floor props

Screw-jack function

 

6

Floor props

Security of hinge plate to prop foot and to main beam

 

7

Floor props

Security of diagonal brace connector

 

8

Diagonal brace

Installed

 

9

Floor props

Floor props vertically upright on the main beams

 

Before disconnecting from the crane:

10

The loading platform is correctly positioned (end cross-beam of the decking must be tight against the slab edge).

 

11

The floor props are screwed tight and force-locked against the slab or the anchorages through the slab are installed.

 

12

Anchorages for the horizontal loads are installed on both main beams.

 

13

Edge protection system is in place up to the loading platform on both sides.

 

Notes (record of deformations / damage / incorrect installation, etc.)

DATE:

SIGNATURE:

.