calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkclose
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK
Contact
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK
Back

DokaScaff UNI

The ringlock scaffolding system from Doka.

Our regional stock yard based in Dubai allows for a speedy delivery to our clients in the Middle East and Africa region. Our branches are located in the United Arab Emirates, Saudi Arabia, Qatar, Oman, Kuwait, Egypt, Lebanon and Jordan.

One Scaffold – Multiple Applications

DokaScaff UNI is built with fewer main components which lead to a significant reduction of commissioning quantities. Regardless of the requirements, up to 80 % of the material is reusable for different applications.

Receive a copy of our brochure and speak with our scaffolding experts.

Connect with us!




30% lighter per m2
30% less individual components
50% faster to assemble

*than traditional scaffolding in a self-conducted test

icon head

Multiple Applications

DokaScaff UNI is the ideal add-on for Doka formwork systems. With this modular scaffolding system, reinforcement and formwork operations can be carried out safely and quickly. Thanks to its versatile and compatible design, it can be used in a variety of ways to suit your project requirements.


icon tick

High Performance

High-speed assembly is made possible thanks to DokaScaff UNI's logical assembly sequence, regardless of application.


icon safety

All-round Safety

Worker protection throughout the assembly process was a major priority when it came to designing DokaScaff UNI. Steel Decks, Access Decks and Stairways provide access within the scaffolding or as a separate tower.


icon efficient

Cost Efficient

Fewer main components lead to a significant reduction of commissioning quantities. Regardless of the requirements, up to 80% of the material is reusable for different applications.

This will reduce investment costs and increase utilisation rates while benefiting from an assembly sequence that follows the same principle for all applications. A high return on investment is also underlined by the hot dipped galvanisation on structural components.