calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK

ParaTop: The ground-support-free cantilever arm formwork from Doka

10.03.2011 | News
The efficient way of forming cantilevers without ground support – that’s ParaTop, the recently developed bridge formwork system from Doka.

Press Contact

The crucial advantage of this ingenious system solution is that all the worksteps – reinforcing, forming and pouring – are carried out from the bridge superstructure. There is no need for any extra working platforms. This saves time and cuts costs. What is more, the large influence widths of the brackets reduce the amount of equipment needed, and speed up the workflow. Because the formwork is so quick and easy to hang into place, less crane-time is needed and assembly operations on the bridge deck are made very much easier. Bridge formwork ParaTop is already doing sterling service on numerous worksites in Ireland, Great Britain, Poland, South Africa and Panama.

This could also be of interest for you:

Innovative Use of Protection Screens Manages Debris at Medical Site in Nashville

04/18/2024 | Press

Joining forces: Malaysian-based MFE Formwork Technology is now part of Doka

02/20/2024 | Press

Do you have any questions on the article? Get in touch with us!

Fields marked with * are required.
* Please fill out all required fields!
Message could not be sent – please try again a little later!