I consent to the use of cookies by this website for analyses and personalized content.
Find out more OK
Gomagoi Tunnel
Italy
The 240 m long tunnel was built using the cut-and-cover method. Owing to its tight radii, a 3-part Doka tunnel formwork traveller was used. The traveller was built from SL-1 system components.