calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
Formwork and Scaffolding from Doka

Rebar scaffolding and formwork in one flow

Ringlock rebar scaffolding are free-standing, secure and stable platforms, ideal for tasks such as tying rebar and pouring concrete. Available in pre-set configurations that can be repositioned on-site as needed.

With formwork and rebar scafolding form one source, our partners benefit from a flexible, customizable solution for nearly any concreting and reinforcement works, regardless of its size or complexity.

Icon Available at short notice

Available at short notice

  • Reliable supply and fast delivery times thanks to worldwide distribution network
  • Large quantities of material available at short notice for sale and rental
Icon One Partner, multiple solutions

One Partner, multiple solutions

  • A single point of contact for formwork and scaffolding
  • Optimally coordinated formwork and scaffolding solutions
  • Cost reduction through joint transport
Fully rentable

Fully rentable

  • High-performance and high-quality rental park for formwork and scaffolding
  • Professional and streamlined rental process guarantees simple and smooth handling
  • Add-on rental enables the handling of larger construction projects without high investments in new material
Global Certifications

Global Certifications

  • DIBt certified scaffolding

Ringlock

Free standing, crane positionable secure and stable working platforms.

Up to a top deck height of 4.50 m, Ringlock rebar scaffolding remains stable without additional bracing against a wall or formwork, allowing uninterrupted reinforcement work. Thanks to its high structural rigidity and the tensile strength of the connections, the scaffold can be quickly and easily repositioned by crane, making it rapidly available at the next work area. Depending on project requirements, a scaffold width of 0.73 m, 1.09 or 1.40 m can be selected, for example to allow reinforcement to be stored directly on the platform. For convenient and safe access, stair units can be integrated as an option.

Learn more about Ringlock

Technical details

  • Maximum topmost deck height: 10.50 m
  • Scaffold width: 0.73 m / 1.09 m
  • Crane positionable up to 9.21 m length (3 bays)
  • Load classes to EN 12811-1: LC 3 with width 0.73 m / LK 4 with width 1.09 m

Build faster. Build safer. Build in one flow.

Proven on small to large-scale, standard and highly challenging projects across a wide range of construction sectors — including bridges, tunnels, high-rise buildings, power plants, and industrial facilities. Below are selected examples of Ringlock rebar applications from projects around the world.

Zdíky Viaduct (D3 Motorway, Czech Republic)

Zdíky Viaduct (D3 Motorway, Czech Republic)

Zdíky Viaduct (D3 Motorway, Czech Republic)

Rebar Scaffolding

U4 station Horner Geest/Hamburg

U4 station Horner Geest/Hamburg
LeftRight


Do you have any questions?
Please do not hesitate to contact us.


Michael Broichgans
Michael BroichgansProduct Manager+4374726052087
 

Contact our scaffolding expert in order to get a quote for your future projects!

Fields marked with * are required.
* Please fill out all required fields!
    Message could not be sent – please try again a little later!