Understanding how to build high faster.
Understanding the construction process truly and being knowledgeable about it is the prerequisite for being a partner to the building sector. We have this understanding from the initial planning stage through to completion of construction. Understanding such as this is based on 40 years experience in self-climbing technology and more than 1000 High Rise projects that were successfully realised worldwide. Construction of the world's tallest building, the Burj Khalifa in Dubai and the 1-km high Kingdom Tower in Saudi Arabia set to surpass it, are but two examples.
With this comprehensive know-how, we are well-qualified to be your high-performing and reliable partner in High Rise construction.
The self-climbing forming and working platform for any highrise core
The crane-independent climbing formwork for structures of any shape and height
The crane-independent climbing formwork for structures of uncomplicated shape and of any height
The Guided climbing formwork Xclimb 60 is a system that is guided on vertical profiles fixed to the structure, even during repositioning. The entire climbing unit is safely and easily repositioned in a single crane cycle, even during high winds.
The crane-jumped formwork for structures of any shape and height
The crane-jumped formwork for vertical-walled structures
The crane-jumped formwork assembled from a Folding platform K and a formwork element
The climbing formwork for inside-shafts
Safe, economical forming of pre-cast facades
The super-strong timber-beam formwork for any requirement
The formwork for cast-in-place columns of any shape and size
The high-performing steel-framed formwork for crane-assisted forming of large areas
The centrepiece of the new Framed formwork Framax Xlife plus is the Framax Xlife plus form tie. It can be operated from one side and saves up to one third in forming and stripping time. Due to its conical shape, there is no need for jacket tubes and cones. Innovative: Form-tie sleeves are completely sealed without wearing parts.
The formwork for rectangular and square CIP columns
The steel formwork for round column cross-sections
The high-speed column formwork with a folding mechanism
The beamless handset system for speed on site
The safe tableform for fast forming
Efficient utilisation of crane capacity and fast-paced construction made possible by largest-possible table units
Fast, safe repositioning with minimal craneage requirements
The variable enclosure for all high-rise projects
The fall-arrest system for formwork and structure shell
The rentable modular scaffold for forming and reinforcing-work
The safe modular scaffold for Access systems as well as forming and reinforcing works
DokaXact - the first interactive wireless formwork positioning system helping site crews to achieve fast, easy and highly precise building of highrise structures with concrete cores.
First-class digital customer service. The portal myDoka offers our clients 24/7 access to project and site-specific data – from the comfort of your PC or tablet. myDoka is convincing with its ease of handling, security of confidential data and opens up an ideal interface with the Doka team.
Remote Instructor is a software solution developed especially for the construction industry to support real-time collaboration on the site using intelligent video calls.
Intelligent connectivity, reliable planning and significant time savings are essential benefits provided by the BIM method. We enable 3D design of formwork-related structural data in Revit and Tekla incl. export of 2D Plans and parts lists, 4D simulation of construction progress of defined work stages and much more. All the above results in less implementation planning effort due to the direct export from BIM and a maximum clarity in the subsequent process.
No results found. The search covers names of Doka products and services.
The international experience of Doka gives you pooled, concentrated knowledge for a successful project. Your contact person will help you find the best individual solution, to make your project's 'bottom line' a success, too. In short: expert specialised formwork planning with lasting benefits for your highrise construction project.