calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkclose

Climbing Formwork

Doka‘s modular system, based on its decades-long experience of widely differing construction tasks, means that it can deliver the right climbing formwork solution across the entire architectural spectrum. For both crane-lifted and crane-independent solutions, the principle is always the same: a high standard of safety, combined with high cost effectiveness and easy, safe handling. The right Doka solution is a key factor in obtaining a fast construction workflow.

climbing formwork
  • Platform SCP

    Platform SCPPlatform SCP

    Platform SCP

    The Platform SCP has room for all the site equip­ment need­ed, and is ful­ly en­closed for safe, weather-shield­ed work­ing, even at great heights. Pow­er­ful hy­draulic cylin­ders crane­less­ly raise the platform, formwork, equip­ment containers and con­crete plac­ing boom to the next cast­ing sec­tion, in on­ly one lift.

    System
    Doka Climbing System
    Type
    Automatic climbing formwork
  • Automatic climbing formwork SKE plus

    Automatic climbing formwork SKE plusAutomatic climbing formwork SKE plus

    Automatic climbing formwork SKE plus

    With its mo­d­u­lar de­sign, SKE of­fers an ef­fi­cient so­lu­tion for any type of struc­ture and any re­quire­ment. The ful­ly hy­draulic equip­ment sup­ports the con­struc­tion work­flow by al­low­ing for fast and safe re­po­si­tion­ing pro­cess­es.

    System
    Doka Climbing System
    Type
    Automatic climbing formwork
  • Automatic climbing formwork Xclimb 60

    Automatic climbing formwork Xclimb 60Automatic climbing formwork Xclimb 60

    Automatic climbing formwork Xclimb 60

    Au­to­mat­ic climbing formwork Xclim­b 60 is a hy­drauli­cal­ly climbed sys­tem that can al­so be quick­ly raised by crane if suf­fi­cient craneage is avai­l­able. Be­cause it is guid­ed on the struc­ture at all times, the sys­tem can still be climbed even in windy con­di­tions.

    System
    Doka Climbing System
    Type
    Automatic climbing formwork
  • Cooling tower formwork SK175

    Cooling tower formwork SK175Cooling tower formwork SK175

    Cooling tower formwork SK175

    This cooling-tow­er formwork is a ful­ly mech­anised, self-climbing large-area formwork sys­tem. It max­imis­es ra­tio­n­al­i­sa­tion and min­imis­es man­u­al labour – af­ter a short fa­miliari­sa­tion pe­ri­od, the crew will soon be ac­com­plish­ing the cast­ing sec­tions in a 1-day cy­cle.

    System
    Doka Climbing System
    Type
    Automatic climbing formwork
  • Climbing formwork MF240

    Climbing formwork MF240Climbing formwork MF240

    Climbing formwork MF240

    Climbing formwork MF240 per­mits con­trolled, reg­u­lar work­ing cy­cles on all struc­tures. The sys­tem is sim­ple to op­er­ate, han­dles wall in­cli­na­tions of up to 15 de­grees and can be di­men­sioned to many dif­fer­ent re­quire­ments over a wide range of ap­pli­ca­tions.

    System
    Doka Climbing System
    Type
    Crane-lifted climbing formwork
  • Dam formwork

    Dam formworkDam formwork

    Dam formwork

    Dam formwork is used for forming one-sid­ed con­struc­tion pro­jects, such as dams, bar­rages, riv­er pow­er sta­tions or py­lons with­out formwork ties. The climbing tow­er will trans­fer all pour­ing loads in­to the pre­vi­ous pour­ing sec­tion. Dif­fer­ent sys­tem variants D12, D15, D22 and D35 fa­cil­i­tate eco­nom­ic adap­ta­tion to vari­ous pro­ject-spe­cif­ic block di­men­sions.

    System
    Doka Climbing System
    Type
    Crane-lifted climbing formwork
  • Shaft platform

    Shaft platformShaft platform

    Shaft platform

    The shaft platform plus shaft formwork are quick and easy to re­po­si­tion, in just one crane cy­cle.

    System
    Doka Climbing System
    Type
    Crane-lifted climbing formwork
  • Climbing formwork 150F

    Climbing formwork 150FClimbing formwork 150F

    Climbing formwork 150F

    Climbing form­work 150F is a tried-and-test­ed sys­tem for crane-lift­ed climbing pro­jects. It is sim­p­ly to set up and easy to use.

    System
    Doka Climbing System
    Type
    Crane-lifted climbing formwork
  • Climbing formwork K

    Climbing formwork KClimbing formwork K

    Climbing formwork K

    The climbing formwork sys­tem for struc­tures that need the formwork el­e­ments to be moved up in sev­er­al cast­ing sec­tions. With on­ly two accessories, the Folding plat­for­m K can be turned in­to a ful­ly func­tio­n­al crane-jumped formwork di­rect­ly on the site.

    System
    Doka Climbing System
    Type
    Crane-lifted climbing formwork
  • Guided climbing formwork Xclimb 60

    Guided climbing formwork Xclimb 60Guided climbing formwork Xclimb 60

    Guided climbing formwork Xclimb 60

    The Guid­ed climbing formwork Xclim­b 60 is a sys­tem that is guid­ed on ver­ti­cal pro­files fixed to the struc­ture, even dur­ing re­po­si­tion­ing. The en­tire climbing unit is safe­ly and eas­i­ly re­po­si­tioned in a sin­gle crane cy­cle, even dur­ing high winds.

    System
    Doka Climbing System
    Type
    Crane-lifted climbing formwork
Show further results