calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK

Doka supports the construction of the world’s tallest residential tower in Dubai

03.11.2026 | Press
United Arab Emirates, 02 November 2026 | In 2024 Binghatti Holdings, one of the largest Emirati Real Estate Developer, joined forces with global formwork and scaffolding leader Doka on a series of landmark projects shaping Dubai’s iconic skyline. Construction is now advancing on the Burj Binghatti Jacob & Co Residences, a residential tower envisioned to become a world-first in architectural horology. The project is supported by Doka’s formwork engineering and advanced climbing systems, which play a central role in driving construction progress.

Press Contact

Impressions

The Burj Binghatti Jacob & Co Residences will be the world’s tallest residential building in Dubai when completed. Developed by Binghatti in collaboration with the luxury watch and jewelry brand Jacob & Co, this project represents a new benchmark for architectural excellence and high-end living in Dubai. Rising in Business Bay, its sheer scale and architectural ambition, which includes distinctive diamond-shaped spires, required a formwork partner with deep engineering expertise and innovative solutions that could ensure speed, safety and precision.

Taher Rihawi, Managing Director Doka Gulf, comments: “We value our partnership with Binghatti and are pleased to contribute our expertise to a project of this significance. The Burj Binghatti Jacob & Co Residences brings together exceptional engineering ambition and a strong local vision. We are proud to support its delivery with reliable formwork engineering and climbing solutions, and we look forward to continuing our close collaboration throughout the construction process.”

Advanced solutions for efficient vertical progress
To meet the structural demands of a tower of this height, Doka is supplying a full package of formwork engineering and climbing solutions for both vertical and horizontal. The Automatic climbing system SKE50 plus allows core and shear walls to rise floor by floor, independent of crane availability. This is essential to keep the project on schedule, with each cycle targeting one floor per week. Parallel site operations benefit from a self-climbing platform, which provides additional working levels, enabling teams to coordinate multiple activities safely and efficiently.

For slab construction, the lightweight Dokadek 30 system ensures fast assembly and consistent quality, while Doka’s Protection screen Xclimb 60 enclose the work areas, creating a safe environment at slab edge. Supporting operations further, the flexible table lifting system (TLS) climbs hydraulically with the platform system, easing handling across all working areas. For the final stage of construction, Doka will deliver additional protection screens to safeguard crews during the façade works ensuring safety and efficiency right to the very top.

Global expertise, local delivery
On site, Doka’s engineering team works hand in hand with the main contractor, ensuring that assembly, logistics and safety follow best-practice standards. This close collaboration underscores the reliability and competence Doka brings to complex, high-rise construction projects. Behind the scenes, the project also benefits from the coordinated efforts of Doka engineering teams at its Austrian headquarters and Dubai. This integrated approach ensured timely design deliverables and enabled the local fabrication of selected system components. It is an important factor in reducing lead times and keeping the project on schedule.

For Doka, the Burj Binghatti Jacob & Co Residences reinforces the company’s position as a trusted partner in super-tall construction across the Middle East, combining global engineering expertise with strong local service capabilities. The project continues Doka’s involvement in the UAE’s landmark developments, from the iconic Burj Khalifa to Burj Azizi, planned to be the second tallest tower worldwide.
Project: Burj Binghatti Jacob & Co Residences
Location: Dubai, UAE
Project type: High Rise
Developer: Binghatti Holdings
Main contractor: Granada Europe Engineering Contractions LLC
Construction period: 2024 – 2026
Year of completion: End of 2027
Doka scope: Platform SCP, Large-area Formwork Top 50, Automatic climbing system SKE50 plus, Dokadek 30, Protection screen Xclimb 60, Table lifting system (TLS)
Doka services: Engineering design, site supervision, training, on-site field service
Overview Products and Services
Doka projects worldwide

This could also be of interest for you:

On the way to Net Zero

01.09.2026 | News

Doka awarded EcoVadis Silver rating

09.04.2026 | Press

Do you have any questions on the article? Get in touch with us!

Fields marked with * are required.
* Please complete all required text fields!
    Message was not sent - please try again later.