calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapcontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuser
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK

St. Christoph biomass-fired co-generation plant

Austria

A biomass plant is under construction near the parking lot to the east of the Heinrich-Findelkind Gallery in St. Christoph. The co-generation plant with state-of-the-art flue-gas cleaning is designed to cover about 92 percent of the heat requirement for the town of St. Christoph. The building will have a footprint of 65 by 15 metres and will house a furnace- and boilerhouse and a wood-chip bunker. The in-situ concrete outside walls are 10.50 m high in fair-faced concrete quality.

Back to overview
Array
Array
Array
Array
Array
Array

Project data

Year of completion
2015
Country
Austria
Town or city
St. Christoph am Arlberg
Contractors
Fröschl Bau Hall
Structure
Thermal power station