calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

WHA Stifterstraße

St. Pölten, Austria

Faster formwork removal through data-based concrete monitoring

At Stifterstrasse in St. Pölten, a modern residential development with a total of 46 apartments, including an underground car park, is being built in the first construction phase, spread across two buildings. Four further construction phases will follow. The project is an important part of the urban expansion and at the same time defines the western urban edge of the state capital.

The Allgemeine Gemeinnützige Wohnungsgenossenschaft St. Pölten commissioned the Lower Austrian Bachner Bauunternehmung GmbH to carry out the construction work.

Back to the overview

Customer requirements
Proof of compressive strength
Complete documentation
Accelerated construction process

Challenge
Changing weather conditions
Use the ideal concrete mix

Solution
Formwork removal 3-4 days earlier per slab through the use of Concremote measurement data.
Documentation of compressive strength through the Concremote report.
In addition, DokaXdek accelerated formwork operations by approx. 0.2 h/m²*.

further project data

The development is characterised by its location between existing residential buildings and adjacent commercial and industrial areas. A generously planned green belt ensures a clear spatial separation and a high quality of life for future residents.

The construction work includes slab thicknesses of 25 cm and 30 cm in the underground car park area. The DokaXdek slab formwork and Framax Xlife systems are among the systems used. In addition, the digital solution Concremote is used to optimise and efficiently manage the construction process based on data.


Testimonal Portrait

Thomas Haslinger | Bachner Bauunternehmung GmbH

„Concreting was usually carried out on Thursdays, with a planned time to target value of 7 days. With Concremote, the target value could already be proven after 4 days, allowing stripping work to start correspondingly earlier.“


Project data

Year of completion
2025
Concremote usage period
03/2025 to 08/2025

Country
Austria
ZIP Code
3100

City
St. Pölten
Customer
Bachner Bauunternehmung GmbH

Building data

Hardware used
2 x Concremote Slab Sensor 2.0
2 x Calibration Box 2.0

Concrete mixes
2 concrete types, C30/37 with N or R cement

No. of measurements
8


Testimonal Portrait

Would you like to explore the possibilities of concrete monitoring for your next construction project?

Get in touch with our experts!

Fields marked with * are required.
* Please fill out all required fields!
    Message could not be sent – please try again a little later!