calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

A7 Bindermichl motorway enclosure

Austria

The 'A7 Betonbau' consortium was able to build the Bindermichl motorway enclosure with the motorway carrying its full volume of traffic. This project, involving the lowering and enclosing of one of the busiest stretches of the Austrian motorway network, was the biggest noise abatement project ever undertaken in the Upper Austrian capital Linz. For the work on the western tube of the tunnel, Doka supplied two tunnel-wall formwork travellers for the casting liners, and a tunnel slab traveller. The tunnel formwork traveller designed for this top-cover tunnel weighed 67 t and was 14 m long. It could cover tunnel widths of 7.25 m (for the typical cross-section) to 8.75 m (for the extra-wide sections of tunnel). Following modifications to the traveller, it was then also used to construct a ramp structure (denoted LZ11), in addition to this contract section.

Back

Project data

Year of completion
2012
Project duration
4 Months
Country
Austria
Town or city
Linz
Realization
'ARGE A7 Betonbau' consortium
Structure
Tunnel

Segmented construction method

Cross-sectional shape
Rectangular
Clear width
7.25 - 8.75 m
Clear height
4.30 m
Formed length of tunnel
212 m
Number of casting sections
20

formwork for top-cover LZ11

Cross-sectional shape
Rectangular
Clear width
15.0 m
Clear height
3.0 m
Formed length of tunnel
200 m
Number of casting sections
6

facing shell

Cross-sectional shape
Rectangular
Clear width
15.75 m
Clear height
6.25 m
Formed length of tunnel
500 m
Number of casting sections
35