calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapcontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuser
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK

City Tunnel, Leipzig, contract section C

Germany

The 'City Tunnel Leipzig' will be the connecting link between the two terminus stations 'Leipzig Hauptbahnhof' main station and 'Bayrischer Bahnhof'. Contract section C: Toward the north, the tunnel passes beneath Leipzig's main railway station, leading to a section which is being constructed as a cut-and-cover tunnel complete with a flying junction. The 800 m long northern and western ramps then link the tunnel to the surface-level network.

Back to overview
Array
Array
Array

Project data

Year of completion
2009
Project duration
12 Months
Country
Germany
Contractors
Leipzig City Tunnel consortium
Structure
Tunnel
Type of structure
Cut-and-cover tunnel

Partially monolithic construction method

Construction method
Partially monolithic
Clear width
6.0 m
Clear height
6.8 m
Formed length of tunnel
320 m
Length of concreting section
10.0 m
Number of casting sections
32