calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlink
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK
United Kingdom

L25 Erlachgalerie avalanche gallery, Defereggental

Austria

The avalanche gallery extends 1093 m overall, of which 140 m were built as a closed tunnel and the remaining 960 m as a gallery structure with an arched cross-section open along one side. On the downhill side, each section of the arched gallery structure is carried on 3 piers instead of a wall. Along the entire length, each section of the gallery cross-section was cast monolithically, complete with the piers on the open, downhill side.

Back to overview
Array
Array
Array

Project data

Project duration
12 Months
Country
Austria
Contractors
Held & Francke Baugeses.mbH
Structure
Tunnel
Type of structure
Cut-and-cover tunnel

Partially monolithic construction method

Construction method
Partially monolithic
Cross-sectional shape
Curved/round
Clear width
9.0 m
Clear height
8.06 m
Formed length of tunnel
1,093 m
Length of concreting section
12 m
Number of casting sections
92