calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapcontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuser
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK

AVE Tunnel Antequera-Peña de los Enamorados

Spain

The builder is a JV company formed by the construction companies Acciona and Torrescámara for this section of the high-speed rail system. Two tunnel forming wagons SL-1 each exceeding 15 m in length were used to build the 790 m long surface tunnel.

Back to overview
Tunnel for AVE high-speed train near Antequera
Tunnel for AVE high-speed train near Antequera 2
Tunnel for AVE high-speed train near Antequera 3
Array

Project data

Year of completion
2011
Project duration
6 Months
Country
Spain
Address
Antequera-Peña de los Enamorados
Town or city
Málaga
Contractors
JV Antequera-Peña de los Enamorados
Structure
Tunnel
Type of structure
Cut-and-cover tunnel

Floor-slab

Construction method
Arched
Cross-sectional shape
Single-cell box girder – straight webs
Formed length of tunnel
790 m
Shape
Radius
Length of concreting section
15 m
Number of casting sections
53
Cycle time
3 days -day cycle
Form-facing
Dokaplex formwork sheet