calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkclose
Contact

Bridge Junglinster

Junglinster, Luxembourg

North-east of the city of Luxembourg, the consortium consisting of the Félix Giorgetty - BAM Galére - Victor Buyck companies built a steel composite bridge that is 444 m long and 17.60 m wide as part of the E29. The formwork solution from Doka made it possible to complete the bidge within the tight schedule specified and in the required fair- faced concrete quality.

Challenges:

• high fair-faced concrete quality
• tight construction schedule necessitated a weekly cycle
• safe working conditions for the entire site crew

Solutions:

The harmonised formwork solution consisting of ParaTop and Composite forming carriage ensures orderly progress.

Array
Array
Array
Array

Project data

Year of completion
2015
Country
Luxembourg
Realization
ARGE aus den Firmen Félix Giorgetti - BAM Galère - Victor Buyck, Luxemburg
Structure
Bridge