calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapcontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuser
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK
Back to overview

Forming wagon T

The site-ready, trav­elling bridge edge beam formwork

Com­bined with a pre-as­sem­bled para­pet formwork that can be cy­cled with­out be­ing dis­man­tled, the trav­elling Forming wagon T is de­signed for high cost ef­fi­cien­cy.

Downloads

High cost-ef­fi­cien­cy

in the cast­ing of can­tilev­ered para­pets 

Ef­fi­cient, fast con­struc­tion progress, in a dai­ly rhythm

  • on longer bridge su­per­struc­tures
  • for high­er num­bers of re­peat us­es
  • for 'sec­tion-at-a-time' re­po­si­tion­ing cy­cles
  • on bridge su­per­struc­tures where it is not pos­si­ble to sus­pend formwork from un­der the cantilever slab
  • for re­ha­bil­i­tat­ing ex­ist­ing bridge su­per­struc­tures
  • on bridges with wide radii

Mul­ti-func­tio­n­al

One sys­tem, sev­er­al util­i­sa­tions 

Flex­i­bil­i­ty, as it can be used as a

  • forming car­ri­age or
  • de­mo­li­tion wagon

Op­ti­mis­es the site lo­gis­tics

with its in­ge­nious sys­tem con­cept 

For on-time, on-bud­get pro­ject im­ple­men­ta­tion, thanks to

  • the high de­gree of pre-as­sem­b­ly of the long-lived, gal­vanised load-bearing con­struc­tion
  • the fast erec­tion and dis­mantling times
  • short re­po­si­tion­ing times
  • the small amount of stor­age space need­ed

The Forming wagon T's high degree of pre-assembly simplifies the site logistics and reduces the rental costs.

Suitable products