06/13/2011 |
Properly planning your jobsite needs can save you time and money. |
 |
|
| |
 |
05/30/2011 |
Set to top out at 1,820 ft., the Lotte Super Tower will be the tallest building in the Far East. |
 |
|
| |
 |
04/04/2011 |
Foldable Protection Screen Xclimb 60 |
 |
|
| |
 |
03/02/2011 |
The Brayton Point Power Plant, New England's largest fossil-fueled generating facility, flushes 1.3 billion gallons of water a day into Mount Hope Bay. |
 |
|
| |
 |
02/22/2011 |
Frami Xlife wins Attendees Choice award at World of Concrete |
 |
|
| |
 |
04/04/2011 |
Quick and easy way to calculate the rate of placement and fresh-concrete pressure according to the formulas in the ACI 347R-04 guide. |
 |
|
| |
 |
01/27/2011 |
Doka Booth and Customer Appreciation Event Photos |
 |
|
| |
 |
12.15.2010 |
Vote Frami Xlife for Most Innovative Product |
 |
|
| |
 |
11/18/2010 |
Doka at World of Concrete 2011 |
 |
|
| |
 |
03/24/2010 |
Doka's new revolutionary load bearing tower wins Most Innovative Product |
 |
|
| |
 |
05/07/2009 |
Doka’s Table Lifting System Receives
MIP 2009 World of Concrete Distinction
|
 |
|
| |
 |
12/19/08 |
Having the highest standard of safety, high cost effectiveness, and easy and safe handling equipment, Doka USA will be proud to display the largest and most flexible sets of solutions anywhere in the market. |
 |
|
| |
 |
12/03/2008 |
Doka's Table Lifting System received the NOVA Award from the Construction Innovation Forum. |
 |
|
| |
 |
10/03/2008 |
The cast-in-place concrete bridge will be the longest continuous segmental span in the United States with a total length of 2,975 feet and a main span of 760 feet. |
 |
|
| |
 |
08/12/2008 |
Doka’s Formwork System Completes the Score for Nashville’s Rhythm Music Row Condominium Complex |
 |
|
| |
 |
07/15/2008 |
Doka USA, a leading formwork engineering and products company, has announced that Andrew Mair has been named CEO. |
 |
|
| |
 |
09.04.2008 |
Doka USA, a leading formwork engineering and products company, will hold a ribbon-cutting ceremony on April 25. for their new facility in Channahon, Ill. |
 |
|
| |
 |
07.04.2008 |
Doka speeds construction on 1,000-foot Devil's Slide Bridge |
 |
|
| |
 |
08.02.2008 |
Doka has added the new guided Xclimb 60 system to their line of climbing products. In addition, Doka has broadened its safety products by introducing the new Doka Protection Screen, which is used in combination with the Xclimb 60 for full multi story perimeter protection on high-rise buildings. |
 |
|
| |
 |
06.02.2008 |
B. Pietrini & Sons, the concrete contractor for the 350,000-square-foot Walnut Street 14-story housing project, turned to Doka USA to provide a variety of formwork solutions. |
 |
|
| |
 |
06.02.2008 |
The first U.S. use of Doka’s Table Lifting System (TLS) in conjunction with pre-assembled Dokamatic Tables has proven to save time and labor on two high-profile projects: the River House Condominiums in Grand Rapids, Mich. and the Renaissance Hotel in Raleigh, N.C. |
 |
|
| |
 |
06.02.2008 |
In order to achieve the type of high-end finish necessary for the building’s 10,000-square-foot post-tensioned concrete parking deck in a compressed time frame, concrete contractor Quintessa Construction relied on Doka’s new Dokaflex S floor slab system. |
 |
|
| |
 |
06.02.2008 |
Precision Concrete chose to use Doka's Top 50 formwork system at the Millennium Gate project for several reasons. “The project requirements were to provide an as-cast finish inside the tower and to achieve American Concrete Institute (ACI) vertical tolerance for walls less than 100 feet,” said John Galasso, Sr. – Field Operations Manager for Precision Concrete. |
 |
|
| |
 |
06.02.2008 |
Based on the company’s success with previous casino projects, concrete contractor Colasanti Specialty Services selected Doka USA to provide formwork for all three of the project’s major components: the 725-foot-tall tower, a garage and nine cores within the podium. |
 |
|
| |
 |
02.01.2008 |
Kiewit-Bilfinger Berger used 2,630-square-feet of segmented Doka Frami formwork to form the one-sided final concrete lining of the Opera Shaft. |
 |
|
| |
 |
27.12.2007 |
Doka USA’s Top 50 large-area formwork and SKE 100 self-climbing system, as well as pre-assembled Dokamatic tables and Dokaflex S formwork will be used on the mixed-use, 76-acre project. |
 |
|
| |
 |
27.12.2007 |
SKE 50 keeps Weatherby Construction on time with its aggressive construction schedule. |
 |
|
| |
 |
27.12.2007 |
The longest cable-stayed bridge in North America. |
 |
|
| |
 |
13.12.2007 |
The Table Lifting System TLS and the guided Climbing formwork Xclimb 60 – two new systems to be showcased by Doka USA at World of Concrete 2008. |
 |
|
| |
 |
14.11.2007 |
First Use of Doka’s Table Lifting System (TLS)in U.S. Speeds Construction for Michigan and North Carolina Projects
|
 |
|
| |
 |
24.05.2007 |
An amazing expo presentation from Doka |
 |
|
| |
 |
13.04.2007 |
Innovative, dynamical, modern ... Using the newest Web-technologies, the Doka-group presents itself in a new “Look & Feel”. |
 |
|
| |
 |
21.02.2007 |
World of Concrete 2007 shattered all previous show records |
 |
|
| |
 |
10.01.2007 |
Doka participating in the World of Concrete Exhibition, January 23 - 26, 2007, Booth C6657. |
 |
|
| |
 |
02.10.2006 |
Using Doka formwork systems - the highest building all over the world is rising in Dubai |
 |
|
| |
 |
15.09.2006 |
Apply for all Doka USA employment opportunites now online |
 |
|
| |
 |
15.03.2006 |
Relaunch of www.dokausa.com! |
 |
|
| |
|
 |
|
|
 |
|
 |
|