calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Töging Power Plant

Töging, Germany

Complex is not enough - Full power for power plant construction In Töging am Inn, Germany, a new hydroelectric power plant – replacing the existing historic power plant – is being built to supply 200,000 households in the region with electricity. This is one of Doka's key disciplines, demonstrating that also slopes of almost 30 degrees and slab thicknesses of four metres can be overcome. Doka provides ideal casting moulds for the concrete even when imagination is stretched to its limits. Ralph Brenner speaks highly of the collaboration with the Doka team. "We had a reliable contact person here at all times, and the custom-built modules came to us already pre-assembled so that we could concentrate on reinforcing and concreting."

Challenge:
Tight construction schedule for a complex structure with extreme dimensions.

Solution:
Doka is an experienced partner in the construction of power plants and has both the corresponding digital and execution skills.

Back to overview

Project data

Year of completion
2021
Project duration
24 months
Country
Austria
Zip/Postal Code
84513
City
Töging
Contractors
PORR GmbH & Co. KGaA