calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Castrovido Dam

Spain

The new dam near Castrovido in the Spanish province of Burgos will have a concrete volume of 635,000 m³. The dam, with a future crest level of 80 m and a crest width of 500 m, is being built with a Doka dam formwork system that stands out for its high load-bearing capacity and maximum safety.

Back

Project data

Year of completion
2014
Project duration
30 Months
Country
Spain
Address
Castrovido Dam, Burgos
Town or city
Burgos
Realization
FCC Construcción, S.A.
Structure
Hydroelectric power station
Type of structure
Industrial structures

Massive concrete dam

Construction method
Inclined
Cross-sectional shape
Single-cell box girder – straight webs
Structure height
80 m
Height of casting sections
2 m
Shape
Radius
Number of casting sections
40