calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapcontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuser
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK

BBI Airport railway link, Berlin

Germany

A tunnel was built as part of the rail link to the terminal building at Berlin's new Schönefeld Airport. For this project, Doka supplied 4 tunnel-wall formwork travellers consisting of a custom steel construction with Top 50 large-area formwork. Staxo 100 load-bearing towers and Dokamatic tables were also used on this project, as were Wall formwork FF 20 and Large-area formwork Top 50.

Back to overview
BBI Airport railway link, Berlin
BBI Airport railway link, Berlin
BBI Airport railway link, Berlin
BBI Airport railway link, Berlin
BBI Airport railway link, Berlin
BBI Airport railway link, Berlin

Project data

Year of completion
2009
Project duration
30 Months
Country
Germany
Town or city
Berlin-Schönefeld
Contractors
JV 'ARGE Schienenanbindung Flughafen Schönefeld BBI': Berger Bau GmbH S, Schälerbau Berlin GmbH, Ingenieurbau-Gesellschaft mbH, Bleck & Söhne GmbH & Co. KG
Structure
Tunnel
Type of structure
Cut-and-cover tunnel

Wall

Construction method
Segmented (non-monolithic)
Cross-sectional shape
Rectangular
Clear height
6.60 m
Formed length of tunnel
3100 m
Length of concreting section
20 m
Number of casting sections
320
Cycle time
7 -day cycle