calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK

220 Central Park South

07.27.2016 | News
220 Central Park South is a residential skyscraper currently under construction, being developed by Vornado. It is located in Midtown Manhattan, New York City, and is being designed by American architect Robert A. M. Stern.
When completed, the tower will be the tenth tallest building in New York City, slightly shorter than Four World Trade Center.

Press Contact

Impressions

  • 220 Central Park South
  • 220 Central  Park South
  • 220 Central Park South

The Facts

Location: 220 Central Park South,
Manhattan, New York City
Construction work performed by:
Cross Country Construction LLC
Sq. ft.: 472,523
Height: 950 feet
Stories: 66
Cycle Time: 3 days on typical floors
Developer: Vornado Realty Trust
Architect: Robert A. M. Stern.
Type of structure: residential skyscraper

The Challenge

This building was designed with a perimeter spandrel beam which is a perfect fit for the custom made steel hinged column and beam formwork.

Products used

  • Core: Super Climber SCP, Frami Xlife wall formwork
  • Shear walls and Columns: Frami Xlife wall formwork
  • Perimeter columns and spandrel beams: Custom Steel hinged forms
  • Building Perimeter Xclimb 60 hydraulic climbing system
  • Floors: Dokadek for the slabs in conjunction with Dokaflex in detailed cut up areas

The Solution

  • The Xclimb 60 hydraulic climbing system is well matched to provide the rollback feature needed to ensure the stripped Formwork can clear the poured concrete in order to climb to the next lift.
  • The Xclimb system also serves as a multi-level work platform system that doubles as protection from anything being able to fall from the working floors, similar to our protection screen system.
  • The hydraulic climbing capability takes the need for the crane away and allows the crane to serve other aspects of the jobsite.
  • The perimeter beam and column design with this smaller footprint yields a flat slab with little or no concrete beams. The project is a flat slab that can be formed very quickly using our large 4’x8’ panels, making it a perfect fit to utilize Dokadek.

The Professional
“We climb the perimeter system first thing in the morning and are able to start the deck formwork around 9:00 am. By noon, we are able to erect most all of the deck formwork because Dokadek is so fast when there are no interruptions. We did approx 7500 sq. ft. within three hours with 4 workers.”

Darren, Foreman,
Cross Country Construction LLC

This could also be of interest for you:

Doka to particpate in constuction Safety Week May 6 – 10, 2024

04/26/2024 | Press

Innovative Use of Protection Screens Manages Debris at Medical Site in Nashville

04/18/2024 | Press

Do you have any questions on the article? Get in touch with us!

Fields marked with * are required.
* Please fill out all required fields!
Message could not be sent – please try again a little later!